Star Rigging spot on at Disney Channel Kids Awards
- Details
The new spot platforms were purpose-built in 2002, as prefabricated structures to provide a safe working area for the technicians on the platforms. The custom-built handrails and lifting points make it a quick and easy system to install. The modular systems are highly adaptable and can be increased as required from 8ft in multiples of 4ft sections. On this occasion there were two single spot platforms, one holding four lights and operators and one adapted to carry the amp rack for Wigwam’s PA. Star Rigging also rigged Wigwam’s flown speaker equipment,