Rain Doesn’t Stop Play for TPC
- Details
The project is managed by David Taylor (pictured) from the Connecticut office of TPC, but George Ellerington of the London wing of Theatre Projects provided the unique theatre equipment package with an array of stage lifts, acoustics banners, hundreds of reverb chamber doors and a 40-ton three-piece canopy, all controlled from a custom PC-based memory system.
The concrete is complete to auditorium level in the concert hall and, to stabilise the building, the attic floor overhead is being poured at present. Despite the difficulties in construction over the summer, the site is being considered for an OSHA safety award. The second performance space, a 550-seat recital theatre is also underwa