PL powers Olympic Torch celebrations
- Details
Power Logistics' project manager, Tony Harpur managed the installation of the power equipment, loading in 10 days prior to the event. The unique location offered many challenges; most notably because the Mall was open to the public during the build, and also because of the high-level security. This meant everyone had to work to a strict load-in and set-up schedule, with wor