M-Net celebrates with grandMA and Robe
- Details
TechRig supplied the full technical and Robert Grobler, from the aforementioned company, was appointed lighting designer of the show which was staged in a multi venue structure on the M-Net grounds. The creative brief was received just over two months ago, and Robert was given free reign in terms of design. He approached the design from a theatrical perspective, the greatest challenge being the weight restriction of the marquee tent. "We did drawings, I had various meetings with the manufacture engineers, and the final outcome was to ensure the overhead stage did not exceed 4 tons," said Grobler.
The event, which included the video clips of earlier days, dancers and performers, w