Clay Paky at the Asian Games 2006
- Details
The German company Procon, through a sub-contract of the Australian Bytecraft, designed, installed and supplied the lights inside the superb Khalifa Stadium of Doha, which was the venue for most of the sporting competitions, as well as the extraordinary Opening and Closing ceremonies of the Games.
Procon supplied 110 Clay Paky Alpha Spot HPE 1200s, which together with many other luminaires, were excellently used by lighting designers Andy Doig and Fabrice Kebaour for their shows. Alongside them, 120 technicians, under the guidance of the Procon project manager Michael Casper, worked non-stop before, after and throughout the event (from 1 to 15 December 2006), using a total of 520 tons of equipm