Unusual Rigging rings the changes for MCI
- Details
With the original equipment delayed in transit, production manager Romain Rossel of MCI Geneva was put in touch with Unusual Rigging and Engineering, who were able to step in and provide the precise control required for the performance.
Project manager for Unusual Rigging & Engineering Leon Ingram explains, "The rings were suspended from a 10m high ground support system, the movement being provided by 11 hoists. With only days to come