Maracaibo Bridge gets W-DMX treatment
- Details
This 8.7 Km bridge opened in 1962 and serves as a vital infrastructure to the economy and mobility of the people in Maracaibo. To commemorate and celebrate its existence and importance, the government requested the six towers that support it to be lit. It became Viu Urbana & Varonaleds' job to design, install and commission this major task.
Viu Urbana & Varonaleds was challenged to complete this job in a short time-frame, and with a live bridge with traffic passing by around the clock. The lighting fixtures had to be installed at both sides of the bridge, which meant having teams in both lanes.
"It was almost impossible for us to use cable to communicate between towers. Each is 280 meters away from