Clay Paky Alpha Spots on Eurovision 2010
- Details
The Alpha Spot fixtures were right in the middle of the action, with the highest number of profiles used on the show. They were built into alternating positions with Jarag units to make up one of the giant walls which could move up or down via Kinesys motion control. The entire back wall was pre-fabricated with custom designed brackets at PRG Birmingham and shipped to Oslo.
Other 'layers' included a wall of Colour Block low-resolution LED fixtures, a 3D curtain of 2000 XL X-Balls over the centre of the stage, and other textural elements such as choucroute, Deko silk drapes, a starcloth curtain and a kabuki drop. PRG with support from Frontlite provided all technical